L-F Ltr 26 JAN 1874
Miss Eleanor Agnes Tomb Stone
Washington Colledge
Oct 16, 1873 To J. J. Hileman Dr
A 6 days work in Quarry M. Beastenfelder at $3.00 $18.00
A 6 A @ for 5 hands each 30.00
A 1 load for a four Horse Team from Mr --?-- 2.00
A Cutting 161/2 days Ch. B. At $3.00 per day 49.50
A Sandrubbing 3 men 4 days 12.00
A Gritting 2 men 41/2 days 9.00
A Glossing 2 men 3 days 6.00
A 40 pieces of Tools Sharpened 2.00
A One load of sand from South River and hand 5.00
A One load to the Chapple from marble yard 1.00
A 1 hand Ch-B to setting work at Chapple 3.00
A 3 hands to assist him 1 day 3.00
A 1 Block of Italian cost in Baltimore 2-6X1-8X0-8" 31.50
A Boxing and Freight on same to this place 9.00
A Cutting the same ch, B. 2 days work 6.00
A Sandrubbing 3 hands 11/2 days 4.50
A Grilling 1 hand 2 days 2.00
A Glossing 2 hands 2 days 4.00
A Putty Pumice Stone & cloth used in glossing 3.00
A 28 letters at 5 cents per letter 11.40
_______
201.90
Deduct 37.04
164.86
Approved $164.86
R. S. McCullough Recd payt of WmDold, Tr
January 26th 1874
J. J. Tileman